Loading…
Loading…
24,576 results • Best match
Sinking of 1 no new cylinder Type Tube well at Primary School, AC-277, Booth No.-266, ward no.-28, Borough-04, under D.M.C.
eProcurement System of Government of West Bengal hosted at WB-SDC Created By: SUJAL NANDI Created Date/Time: 21-Feb-2026 01:15 PM Tender Title: Sinking of 1 no new cylinder Type Tube well at Primary School, AC-277, Booth No.-266, ward no.-28, Borough-04, under D.M.C. Tender ID: 2026_MAD_5010935_2
Urgent basis surging of 10 (Ten) nos 200 mm dia river bank tube wells at river of Ajoy (for Shymla W/S Scheme) under Jamuria Block under RCFA Division-I PHE Dte.
eProcurement System of Government of West Bengal Created By: RUPAM GHOSH Created Date/Time: 11-Jul-2025 12:52 PM Tender Title: Urgent basis surging of 10 (Ten) nos 200 mm dia river bank tube wells at river of Ajoy (for Shymla W/S Scheme) under Jamuria Block under RCFA Division-I PHE Dte. Tender ID: 2025_PHED_851126_7
Lifting/Lowering of submersible pump sets along with all allied E AND M accessories for various tube-wells in Ballimaran ward No-79 in AC-22
Construction of Gravel Packed Tube Well with Installation of Hand Pump including Construction of Platform sock pit and Drain etc work Group No 05
Supplying all materials, labours and equipment to seal the tube well up to the depth of 10 mtrs. Below by strictly clay to prevent continuation from surface flow all complete job as per direction of E/I.
Construction of Gravel Packed Tube Well with Installation of Hand Pump including Construction of Platform sock pit and Drain etc work Group No 03
Supplying all materials, labours and equipment to seal the tube well up to the depth of 10 mtrs. Below by strictly clay to prevent continuation from surface flow all complete job as per direction of E/I.
Construction of Gravel Packed Tube Well with Installation of Hand Pump including Construction of Platform sock pit and Drain etc work Group No 04
Supplying all materials, labours and equipment to seal the tube well up to the depth of 10 mtrs. Below by strictly clay to prevent continuation from surface flow all complete job as per direction of E/I.