Loading…
Loading…
6,173 results • Best match
Raising of Compound Wall and Construction of Platform for Rituals at Bodigadi Thota Burial Ground in Division No.5 in Nellore Municipal Corporation.
Staircase Repair and Boundary Wall Repair and other minor works Residential Building Type-II (2645 to 2652) Ground, 1st and 2nd floors in Sector-28, Chandigarh (Total 24 Nos Houses)
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand) (As per DSR 13.2.1)
Repair and maintenance of 26 nos. rooms inside and outside along with boundary wall of Executive hostel at Urimari Project of Barka-Sayal Area.
Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters.35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws
Estimate for Construction of Boundary Wall including beautfication and leveling BYMA play ground in ward no 06 under Bhatpara Municiplity under APAS (Scheme ID APAS/01/105/12/0002)
Estimate for Construction of Boundary Wall including beautfication and leveling BYMA play ground in ward no 06 under Bhatpara Municiplity under APAS (Scheme ID: APAS/01/105/12/0002)
Swimming Pool - 25x12.5m, Balancing tank,Filtration room, Change room cum office, Compound wall, RCC Retaining wall, RCC step gallery, Open Well, Inauguration stone, Electrification work and Filtration works
22.26 Providing and applying of swellable type water stop tape, 19mm x 25mm thick in linear meter (expansive nature) for construction joints treatment of RCC structure such as raft slab, retaining walls, water storage tank and at the junctions of raft slab with the retaining walls etc.. After cleaning the surface, one coat of required primer for swellable water stop tape shall be applied throughout the length of the joint @3.78 litre per 240 running meter. Over the primed surface swellable type water stop tape shall be placed. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.
Works