Loading…
Loading…
6,226 results • Best match
Estimate for Construction of Boundary Wall including beautfication and leveling BYMA play ground in ward no 06 under Bhatpara Municiplity under APAS (Scheme ID APAS/01/105/12/0002)
Estimate for Construction of Boundary Wall including beautfication and leveling BYMA play ground in ward no 06 under Bhatpara Municiplity under APAS (Scheme ID: APAS/01/105/12/0002)
Swimming Pool - 25x12.5m, Balancing tank,Filtration room, Change room cum office, Compound wall, RCC Retaining wall, RCC step gallery, Open Well, Inauguration stone, Electrification work and Filtration works
22.26 Providing and applying of swellable type water stop tape, 19mm x 25mm thick in linear meter (expansive nature) for construction joints treatment of RCC structure such as raft slab, retaining walls, water storage tank and at the junctions of raft slab with the retaining walls etc.. After cleaning the surface, one coat of required primer for swellable water stop tape shall be applied throughout the length of the joint @3.78 litre per 240 running meter. Over the primed surface swellable type water stop tape shall be placed. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.
Works
REPAIR/MAINT OF FENCING, RCC POST, BOUNDARY WALL AND MISC B/R WKS IN OTM ACCN UNDER AGE B/R-I, GE BABINA
M &L for hand rails, half round or other steel section or core for wooden hand-rail straight portion, drilled and countersunk for balusters running bars, for doors, balusters, nosing to steps including embeding in concrete and screwing etc. wind ties for roof including securing bolts;posts and struts in fencing including cutting tops to shape as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.) including all necessary drilling, bolting or riveting, etc., and similar work conforming to Fe-290 Gde E-165 complete all as specified & directed.
(Moulik Nidhi) Construction of Boundary wall at Rampuri Mohalla Ramdaas Ghati Zone No.07 Ward No.02.File No.324/25X3/3.3rd Call.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding upto floor level including cost of binding wire, wastage and overlaps upto 12 mm horizontal/inclined position of reinforcement bars in slab and beams, plinth, chajjas, lintels, upto 4.5 m vertical length of reinforcement in wall columns (overlaps shall be provided as per requirement of IS:13920; IS456 & SP: 34) etc. complete. Hot rolled deformed bars For Foundation (16 mm dia @ 1.59 kg/m) For Plinth Beam (Main bar 12 mm dia @ 0.89 kg/m) (Hanger bar 12 mm dia @ 0.89 kg/m) For Supporting Columns (Bar 12 mm dia @ 0.89 kg/m) For Retaining Wall (Long. Bar = 10 mm dia @ 0.62 kg/m) (Lat. Bar = 10 mm dia @ 0.62 kg/m)
Construction of New Sub Center (G+1) With Compound Wall at Village Suvag, Ta-Paddhari And Vad Vajdi ,Ta. Lodhika Dist. -Rajkot
Finishing wall with weather proof exterior emulsion paint on wall surface (three coats) to give an required