Loading…
Loading…
5,917 results • Best match
Construction of compound walls in Anganvadi centre no. 74/1, At Bhilvada Circle, Bhavnagar.
20mm thick sand faced cement plaster on walls upto
Construction of Boundary Wall at 3rd Tube well site of DEOTALA Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work).
Construction of Boundary Wall at Head Work site of NASIPUR Water Supply Scheme under Ratua-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work).
Construction of Boundary Wall at Head Work site of BETAHAL Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work).
Construction of Boundary Wall at Head Work site of SULTANNAGAR Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work).
1)Construction of compound wall (40m) and toilet arrangements near OHT,2)Providing pipe line from OHT to newly constructed bath tub (295m),3)Construction of bath tub for burial ground at L.Malaiyur, H/O Lingavadi
1.Construction of compound wall (40m) and toilet arrangements near OHT at L.Malaiyur, H/O Lingavadi Estimate Amount Rs.7.25 Lakhs