Loading…
Loading…
6,173 results • Best match
Demolishing brick work ,Earth work excavation and Reinforcement etc.
HSR Item 6.29.2-Centering and shuttering including strutting, propping etc. and removal of form work for : 2. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Pimpri Chinchwad Indl Area...M and R to WsS....Construction of Compound wall to newly carved Layout at Bijalinagar, Chinchwad
Repair of Existing boundary wall and drain side protection from RD 3065 M to RD 2600 M at Shahdara Link Drain.
15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand)
PKG 2 TOILET BLOCK REPAIRING WORK OF PRIMARY SCHOOL IN OLPAD TALUKA 1 CONSTRUCTION OF TOILET BLOCK AT PARDI KOBA PRIMARY SCHOOL 2 REPAIRING OF PRIMARY SCHOOL AT MAHOMADPOR DIST SURAT 3 CONSTRUCTION OF COMPOUND WALL AT GOLA PRIMARY SCHOOL 4 ... 4 CONSTRUCTION OF ... OF COMPOUND WALL ... COMPOUND WALL AT ...
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats)
swm work
Construction of a connecting road to the F.S.T.P. unit being built at the solid waste disposal facility within the Gudibande town panchayat limits, and the work of constructing the remaining compound wall.
CONSTRUCTION OF BOUNDARY WALL AND INTERLOCKING WORK IN THE COURTYARD OF DAUJI TEMPLE LOCATED IN NAGLA LEKHA, BLOCK- RAYA, MATHURA, U.P.
BOUNDARY WALL Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.