Loading…
Loading…
35,847 results • Best match
Civil Work
Construction work of stadium, basketball court, volleyball court, track, and boundary wall at the playground of Parbaini School, Rajgarh, Alwar
Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, ...
REPAIRS TO DRAIN BOUNDARY WALL FENCING GATES CULVERT ETC IN ZONE C AREA UNDER AGE BR (N) NO I OF GE (N) SECUNDERABAD
S&F in repairs Galvanised, 2 strand, steel barbed wire 2.24mm dia barbed with 2mm dia barbs at 75mm spacings and straining and fixing to any type of standard rails straining bolts, including, securing or tying at crossings with and provision of galvanised mild steel wire, staples or steel pins, etc. complete all as specifed and directed. (each line wire to be measured)
Repairing of Boundary wall and allied works at Bagdogra Old PWD Office Campus( west Side) under North Bengal Construction Division,PWD, in the district of Darjeeling.
4.00 UPASANA CONSTRUCTION (GSTN-NA) BID ID -8052768 456825.000 1.000 461393.250 Four Lakh Sixty One Thousand Three Hundred and Ninety Three
At Booth No- 277 1) Repairing of 1 class room of Kamurdiar Nazbul Haque Girls Jr. High Madrasha under Ghoramara GP 2) Construction of boundary wall of Kamurdiar Boradabapara Gorasthan at Ghoramara
eProcurement System of Government of West Bengal Created By: Sankhadip Das Created Date/Time: 09-Jan-2026 05:40 PM Tender Title: At Booth No- 277 1) Repairing of 1 class room of Kamurdiar Nazbul Haque Girls Jr. High Madrasha under Ghoramara GP 2) Construction of boundary wall of Kamurdiar Boradabapara Gorasthan at Ghoramara Tender ID: 2025_ZPHD_927696_17
Construction of KSN Drain boundary wall from RD 7850m to 4150m for protection of Govt. land in Kirari AC-09
Construction of Longitudinal bundies for raising of side wall of retaining wall section with filled up E.C. bags for diverting the flow of KSN drain during construction operation round the clock & subsequent removal of the same after completion of construction work as per direction of Engineer-in-charge.