Loading…
Loading…
4,343 results • Best match
Estimate for Construction of VR Bridge at RD 203200 of Bahadur Singh Wala Drain
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture.
Estimate for Construction of VR Bridge at RD 199400 of Bahadur Singh Wala Drain
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture.
Construction of Bridge in Hanumanahalli-Bommarasanahalli road at Ch 11.0 km in Madhugiri taluk (Chandragiri)
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Construction of 2nos of Road over bridge (ROB) and 1nos Road Under bridge (RUB) along with construction of service road and drainages in Lieu of Level crossings (LC) along the Corridor-4 Heelalige to Rajanukunte
CONSTRUCTION OF MEDIUM BRIDGE (6.00M SPAN SLAB CULVERT) AT KM. 3/2 OF SONPURI TO BHUDKUDA ROAD
N.I.T. SHEDULE FOR CONSTRUCTION OF MEDIUM BRIDGE (6.00M SPAN SLAB CULVERT) AT KM. 3/2 OF SONPURI TO BHUDKUDA ROAD
Repair of damaged concrete railing and painting of Punjabi Bridge Km 360 600 Gonpur Bridge Km 367 850 and Mollarpur ROB Km 373 600 including repair of pedestal at Pier no 4 24 27 of Mollarpur ROB along NH 60 New NH 14 under NHD XII Birbhum
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Reference to MORT&H's specification clause 202). By Mechanical Means, Reinforced cement concrete