Loading…
Loading…
4,403 results • Best match
Repair of wooden bridge at 6 gheri over Argoal link khal within GP-Mathura, Block-Patashpur-II, Dist- Purba Medinipur
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. (V) 20 cm av. Diameter
Construction of bridge from Wagdhari to Muradi village in Aland Taluka under 5054 for the year 2025-26.
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Construction of High Level Bridge over Dhowae River at ch 41st km and Construction of High Level Bridge over Mudko River at ch 30th km of Dumka-Hansdiha Road under Road Division Dumka for the year 2026-27
Provision of an Reinforced cement concrete crash barrier at the bridge decks& approaches to bridge structures constructed with Rein forced Cement Concrete With HYSD reinforcement confirming MoRT&H Specification and as per details given IRC-5 including dowel bars ,expansion joints filled with pre-moulded asphalt filler board etc.. and approved drawing and at locations directed by the Engineer ,all as specified .Crash Barriers for Bridge (Height 1100 mm) as per detais given IRC-5 (fig.-2 ) (Area -0.298 sqm. For 1 meter length ) SOR - 14.15B (For 30th Bridge)
Construction of a Bridge at Ch.4.50km Near Siddanahalli Village in Sulikunte Panchayat Bangarpet taluk/Call-2
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Construction of H.L. Bridge over Nuanai Nallah on Ghatpur to Ratani road in the District of Bhadrak under SBY for 2026-27.
Supplying, Providing & laying reinforced cement concrete M-15 grade (cast-in-situ) as per design mix prepared under relevant IS/IRC codes concrete using graded crushed stone aggregate, cement and coarse sand of approved quality and quantity in wing walls, retain walls & curtain walls as levelling course using weigh batching, mechanically mixing, vibrating, centering & shuttering, decentering secured tools & plant equipments & including all inclusive costs, all operations, contingencies incidentals involved for the finished defect free items of work complete to satisfaction but excluding cost of reinforcement complete as per drawing and technical specification Part I/II under section 1500,1700 & 2100 of MORTH specification for Road & Bridge works (4th revision) and as directed by Engineer or his representative full satisfaction.Providing PCC M15 as leveling coarse below pile caps & as per section no.1500,1700 & 2100 of Specification for road & bridge work MoRT&H (4th revision)
Construction of Bridge at Ch 0.80 Km on Anatapur to Myshamma Temple Road in Sedam Taluka Kalaburagi District.
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...