Loading…
Loading…
4,446 results • Best match
Construction of H.L. Bridge over Nuanai Nallah on Ghatpur to Ratani road in the District of Bhadrak under SBY for 2026-27.
Supplying, Providing & laying reinforced cement concrete M-15 grade (cast-in-situ) as per design mix prepared under relevant IS/IRC codes concrete using graded crushed stone aggregate, cement and coarse sand of approved quality and quantity in wing walls, retain walls & curtain walls as levelling course using weigh batching, mechanically mixing, vibrating, centering & shuttering, decentering secured tools & plant equipments & including all inclusive costs, all operations, contingencies incidentals involved for the finished defect free items of work complete to satisfaction but excluding cost of reinforcement complete as per drawing and technical specification Part I/II under section 1500,1700 & 2100 of MORTH specification for Road & Bridge works (4th revision) and as directed by Engineer or his representative full satisfaction.Providing PCC M15 as leveling coarse below pile caps & as per section no.1500,1700 & 2100 of Specification for road & bridge work MoRT&H (4th revision)
Construction of Bridge at Ch 0.80 Km on Anatapur to Myshamma Temple Road in Sedam Taluka Kalaburagi District.
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Bitumen Road work at Power House Road Fatak to Old Bus Stand (Under Bridge Raod) at Korba
Construction of Bridge in Golaghat District i) Br. No. 1/1 on Turung Gaon Ali
Implementation of Enviromental and Social Management Plan -Air quality monitoring at 3 locations before the start of the construction work and will be treated as the baseline data. (3 Locations x single time = 3 Nos. of sample) First Year 1st season of of the works (i) Br.No.1/1 Turung Gaon Ali
CONSTRUCTION OF STEEL BRIDGE ON THE EXISTING ABETMENTS NLO MOHD YOUNIS MIR OTHERS AT KANJIKULLA
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded
Proposed Construction of Weigh Bridge and Operator Room with 1000 MT Godown at Kundhit, Jharkhand
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.