Loading…
Loading…
4,591 results • Best match
Construction of H.L. Bridge over Dhankan Nallah at 1st Km on Turanipada near Tarini Mandir Nahanga Talamahuri road in the District of Balasore under SBY for 2026-27.
Loosening of the ground upto a level of 500mm below the sub-grade level, watered, graded and compacted in layers to meet requriement of table 300-2 for sub-grade construction and clause 305 of MoRT&H Specifications for Road & Bridge works (4th Revision)
Maintenance and repair to Karaidanga wooden bridge over S.W.F. under Calcutta Drainage Outfall Sub-Div. No. II of Calcutta Drainage Outfall Division during year 2026-27
Best seasoned wood work in posts, plates, rafters, trusses,beams,purlins,bargas,frames etc. including supplying at site hoisting fitting fixing in position excluding the cost of bolt and nuts only but including the cost of nails and screws with cost and carriage of all materials complete as per the direction of the Engineer-in-charge.(The quantities shoulds be measured upto 3 decimals) b) Best seasoned wood- Arjun/Mahua/Tentul as approved by Engineer-in-charge
Road work
Earth work in excavation of foundation trenches & Columns in all kinds of soil within all lead and lifts including dressing the sides, shoring (if nacessary), bailing out water and leveling the bed and depositing the excavated materials away from the work site including all costs of labour,sundries, tools & plants required for the work etc. complete as per direction of Engineer-in-Charge.
Construction Of Bridge at 27.36 Near Bhutpur On SH180 From Highway Connecting Hayyal (Karnataka/Telangana Border) to Kadechur In Sedam Taluka Kalaburagi District
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Construction of 1x40mtr span steel truss girder motorable bridge over Tserap river including approach road at Nuru Lungnak Zanskar.
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (A) All kinds of soil.
Construction of Bridge in Dhemaji District i) Br. No. 3/1 on Chawbari to Namani Mechaki Road over River Tangani
Implementation of Enviromental and Social Management Plan -Air quality monitoring at 3 locations before the start of the construction work and will be treated as the baseline data. (3 Locations x single time = 3 Nos. of sample) First Year 1st season of of the works (i) Br. NO. 5/1 on Bormukali to Chawbari Road over River Tangani