Loading…
Loading…
4,591 results • Best match
Construction of M-40 Grade CC Road, Drains, and Footpaths on both sides of Gohalpur Bridge, under Division No. 06.
1.01 Construction of M-40 Grade CC Road, Drains, and Footpaths on both sides of Gohalpur Bridge, under Division No. 06. (First call ) BI01010001010000000000000515BI0100001113 1 Work 13561256 Excess(+) Full Conversion INR
CONSTRUCTION OF CEMENT CONCRETE ROAD AT WARD NO 29 BRIDGE KE SIDE WALI ROAD RATLAM AS PER NIT AND ESTIMATE
CONSTRUCTION OF CEMENT CONCRETE ROAD AT WARD NO 29 BRIDGE KE SIDE WALI ROAD RATLAM AS PER NIT AND ESTIMATE
Estimate for construction of V.R Bridge cum Fall cum Head Regulator of Sekhupura Minor at RD 14980 of Ghuram Disty.
35 Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94- DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture. t35 1 mtr 0 Excess(+) Full Conversion INR
Construction of Bridge across the Dalai River on the Road from Hayulaing Chaglagam BRO Road (Metengliang) to Khowegko, Span-80.00m.
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical means.
Construction of Bridge across the Dalai River on the Road from Hayulaing Chaglagam BRO Road (Chipru) to Kalabro, Span-80.00m
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Construction of Bridge in Dibrugarh District i) Br. No. 2/1 on Sessa Koch-1 to Sessa Koch 2 Road
Implementation of Enviromental and Social Management Plan -Air quality monitoring at 3 locations before the start of the construction work and will be treated as the baseline data. (3 Locations x single time = 3 Nos. of sample) First Year 1st season of of the works (i) Br.No. 2/1 on PMGSY Road Sessa Koch -1 to Sessa Koch 2