Loading…
Loading…
4,591 results • Best match
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS SAPNAI NALLA INCLUDING APPROACH ROAD ON TILGA-BHAGORA JAMGAON ROAD (M.D.R.) Km. 7/6
Construction of RCC foot bridge near South Hurua Panchayet office of Kalacherra RD Block under RD Dharmanagar Division North Tripura
Construction of RCC foot bridge near South Hurua Panchayet Office of Kalacherra RD Block under RD Dharmanagar Division (1 Complete work)
Construction of Bridge in Dhemaji District i) RCC Br. No 1/1 on Chawbari to Namani Mechaki Road over River Tangani
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Mechanical Means (B) RCC
Re-Construction of Wooden Bridge at Mahabisra over Ghatua khal at G.P.- Kasba in Block-Egra-I ,and Dist.-Purba Medinipur.
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. (V) 20 cm av. Diameter
Dima Hasao/11 Construction of Bridge in Dima Hasao District (i) Br No. 6/1 on Chotowapu to Bhanjikhallu via Motiphonglo.
Providing and constructing temporary island 16 m diameter for construction of well foundation for 6m dia. well. Assuming depth of water 4.0 m and height of island to be 4.5m. Br. No. 6/1 Chotowapu to Bhanjikhallu via Motiphonglo (Span 2 x 20 + 1 X 40)
CSIND- Chain link Fencing for the Protection of Kollam thodu from Iron Bridge to Ashtamudi Kayal in between Ch.73.65km to 74.18km - Balance Work
15.3 : Demolishing R.C.C. work manually /by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer - in - charge.