Loading…
Loading…
4,693 results • Best match
Construction Of New Major Bridge Over Indravati At KM 302.280 Of NH-26 In The State Of Odisha On EPC Mode
Construction of new Major H.L. bridge utei at km. 87.900 on NH 59 in the state of Odisha on EPC mode
Sub: Construction of new Major H.L. Bridge “UTEI” at KM. 87/900 On NH 59 in the State Of Odisha on EPC mode.
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACH ROAD ACROSS KALIBEDA NALLA IN KM. 2/10 ON MAKDI – HIRAPUR ROAD.
Construction of Minor Bridge on Chharchhoda Kheda Falia Road at Ch. 1/50 Ta. Garbada Dist. Dahod (Reinvited 6th Attempt)
approaches to bridge structures and medians, constructed with M-
Re-Construction of Bagdibandh Wooden Bridge at Bagdibandh over Paninala Khal at G.P.- Barhat, Block Patashpur-I, Dist.-Purba Medinipur
Earth work from borrowpits over existing embankment or for repairs to embankment,closing breaches etc.with in an initiallead of 30metre and lift of 1.50metre including breaking clods and depositing the same in layers not exceeding 25cm.and roughdressing etc.complete as per profile.
Construction of High Level RCC Girder Bridge Across Torwa River Between Barhe Gram Under Yogiyara Panchayat in Pratappur Block of Chatra District.
CONSTRUCTION OF BRIDGE Excavation for structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) i) Ordinary Soil (Excavation upto 3.0m depth)