Loading…
Loading…
4,702 results • Best match
Construction of Bridge in Dhemaji District i) RCC Br. No 1/1 on Chawbari to Namani Mechaki Road over River Tangani
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Mechanical Means (B) RCC
Re-Construction of Wooden Bridge at Mahabisra over Ghatua khal at G.P.- Kasba in Block-Egra-I ,and Dist.-Purba Medinipur.
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. (V) 20 cm av. Diameter
Dima Hasao/11 Construction of Bridge in Dima Hasao District (i) Br No. 6/1 on Chotowapu to Bhanjikhallu via Motiphonglo.
Providing and constructing temporary island 16 m diameter for construction of well foundation for 6m dia. well. Assuming depth of water 4.0 m and height of island to be 4.5m. Br. No. 6/1 Chotowapu to Bhanjikhallu via Motiphonglo (Span 2 x 20 + 1 X 40)
CSIND- Chain link Fencing for the Protection of Kollam thodu from Iron Bridge to Ashtamudi Kayal in between Ch.73.65km to 74.18km - Balance Work
15.3 : Demolishing R.C.C. work manually /by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer - in - charge.
Repair to Bridge overLocal nalah at 3.1km on Mruganayani to Singiti_Road_Wearing coat ,approch road -CC- , colouring,Retaining wall-80mtr-,stone packing_3.200 to 3.240-LA- , 3.310 to 3.450-RA-
Repair to Bridge over river Kochila at 1.0 km on PWD Road To Astak _Road_Wearing coat, colouring,approach road-CC-_0.900 to 1.200 -LR- 1.100 to 1.280-RA-
Construction of embankment with approved material obtained from borrow pits with all lead and lifts, transporting to site by mechanical means within a lead of 5 km., spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoSRT&H specifications etc. complete.