Loading…
Loading…
4,700 results • Best match
Widening and Construction of 4-Lane High Leval Bridge in Place of Existing 2-Lane Bridge Across Ayad River and 2-Lane RUB as 4-Lane RUB Below SH 32 on The Balicha Pratap Nagar 4-Lane Bypass. 1401
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Lime Concrete, cement concrete grade M-10 (1:5:10) and below
Construction Of Bridge On Nala Coming At Km 22.55 and At km 9.90 On MDR Nalatawada Tangadagi Road In Muddebihal Constituency Of Vijayapur District.
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20mm nominal size graded crushed coarse aggregates.
Strengthening of Fefartal to Dongarwada road, Length 3.50 Km. under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 126.32 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening of Fefartal to Dongarwada road, Length 3.50 Km. under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 126.32 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening of Raisalpur to Panjra Road, Length 3.80 Km. under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 146.26 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening of Raisalpur to Panjra Road, Length 3.80 Km. under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 146.26 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Construction of H.L Bridge Over Local Nallah at 3rd Km on Banimila to Palamika Road Under SBY in the District of Kandhamal for the Year 2024-25
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoSRT&H specifications for Road and Bridge works (4th Revision) with cost of all labour, T&P and with cess, royality and as per direction of Engineer-in-charge. (Payment of earthwork will be made on compacted level section) only
Construction of 1 Nos. Major Bridge, 2 nos Box culvert and 1 nos. Hume Pipe Culvert with Approaches under Submergence and one Major Bridge and 1 nos. Hume Pipe Culvert For Connecting Road Up to Bina Refinery Betwa Barrage
On tun key basis Construction of 1 nos. Major Bridge, 2 nos. Box culvert and 1 nos. Hume Pipe Culvert with Approaches under Submergence and one Major Bridge and 1 nos. Hume Pipe Culvert For Connecting Road Up to Bina Refinery Betwa Barrage project.