Loading…
Loading…
4,694 results • Best match
Renovation of 2 nos HR gates and its hoist accessories and repair, maintenance of the walkway bridge of Mahinsanala MIP of Dasapalla Block under Superintending Engineer, Minor Irrigation Division, Nayagarh for the year 2026-27.
Supply cost of materials for repair of waklway bridge
Construction of Bridge cum weir across Arkavathy river to Connect Kunthikal doddi village from Kanakapura - Ramanagara main road in Aralimaranahalli G.P, Kanakapura taluk, Ramanagara Distirct
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Strengthening of Nimsadiya to Panjra road (B.T. Length 3.20 Km.) under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 150.76 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening of Nimsadiya to Panjra road (B.T. Length 3.20 Km.) under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 150.76 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
GENERAL-Investigation estimate for Construction of bridge at Modavannakadavu Across Chaliyar river -Connecting Chaliyar Grama panchayath and Nilambur Municipality in Ernad LAC in Malappuram District
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
Re-Construction of Dulalpur Wooden Bridge at Phajelpur over Paninala Khal at G.P.- Barhat in Block- Patashpur-I and Dist.-Purba Medinipur
Earth work from borrowpits over existing embankment or for repairs to embankment,closing breaches etc.with in an initiallead of 30metre and lift of 1.50metre including breaking clods and depositing the same in layers not exceeding 25cm.and roughdressing etc.complete as per profile.
Re-Construction of Minotibag Wooden Bridge at jalpai over Palabani Khal at G.P.- Heria in Block- Khejuri-I and Dist.-Purba Medinipur
Earth work from borrowpits over existing embankment or for repairs to embankment,closing breaches etc.with in an initiallead of 30metre and lift of 1.50metre including breaking clods and depositing the same in layers not exceeding 25cm.and roughdressing etc.complete as per profile.