Loading…
Loading…
21,609 results • Best match
Repairing of Expansion Joint and Rehabilitation work to Churni Bridge at Ch 9.00 kmp of Shibnbash - Bajitpur road under Krishnagar Hwy. Sub-Divn No-II of Nadia Highway Division No-I P.W(Roads) Dte.in the District of Nadia during the year 2025-2026
Shifting of HT/LT line regarding upgradation of road work from Chawmanu to Govindabari via 32 Kilo (T21) / Length - 32.164 Km / (Package No-TR-04-05 P2) including 1(one) LS Bridge under Chawmanu Block within the jurisdiction of Chawmanu Electrical Su
Performance based Maintenance Contracts (PBMC) work of Asian Highway 02 (Ch. 0.000 to 1.500) from Nepal Border Mechi Bridge and approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India in the state of WB in FY 25-26
Construction of Box Bridge ( 12 nos 5.00m X 5.00m ) over Pitanu River at Damdama with Bolder protection at embankment and Paver Block Approach road under Bazargaon-II GP under Karandighi Block in the district of Uttar Dinajpur.
Construction of plant and manifold room with connecting bridges for set up of MGPS connection for new 100 bedded building, Habra SGH - EI work.
Cutting channel of 40 mm x 40 mm size on masonry wall incl. S&F heavy gauge polythene pipe dia as stated below, by means of iron hooks and supplying and drawing 18 SWG GI Wire as fish wire incl. mending good damages to building works 19 mm dia 3 mm thick polythene pipe without earth continuity wire
Balance work of Formation, Blanketing Construction Extension of minor Bridges, Limited Height subways between Ch1194_500 to 1195_675 Protection and Drainage Arrangement works Between KTE SGRL
Contract No: IRCON/2065/KSDP/bal. formation and protection works/144 Dated 30/12/2025