Loading…
Loading…
21,511 results • Best match
Constructing a new Cross Drainage at KM 14.90 on M.K Hubli Bailwad MDR Road in Bailhongal taluk under 3054 MDR Bridge Maintenance for 2025-26.
... in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates ...
Repairing of WBM road coal transportation during monsoon post monsoon from check post to weigh bridge at SDOCM from Bina village road to checkpost from checkpost to Tjunction and loop road near weigh bridge at Bhanegaon OCM
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400- 2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel ...
Repairing and Maintenance of Bridge in Jorhat- Golaghat district Bridge in Jorhat Golaghat district Br. No. 1/1 on Tekela gaon Road i) Br. No. 1/1 on Dhonkhuloi Gorumora Road i) Br. No. 1/1 on Sarucharai Ghorphohila Road
Repair of RCC Railing Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911 Br. No. 1/1 Dhonkhuloi Gorumora Road
Repairing of Bridge, Culverts, Protection Wall of different road of Sub Division, Seoni Malwa (Section Dhekna). 1st Call, PAC Rs. 19.37 Lacs on Road Bridge SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection Wall of different road of Sub Division, Seoni Malwa (Section Dhekna). 1st Call, PAC Rs. 19.37 Lacs on Road & Bridge SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection Wall of different road of Sub Division, Seoni Malwa (Section Dolariya). 1st Call, PAC Rs. 19.56 Lacs on Road Bridge SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection Wall of different road of Sub Division, Seoni Malwa (Section Dolariya). 1st Call, PAC Rs. 19.56 Lacs on Road & Bridge SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
GENERAL Bridges North Circle Kozhikode Providing gate and interlocked concrete paver blocks General Civil Work 1
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.