| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC | ₹10.7 L | L1 | Accepted-AOC Work awarded and agreement executed |
| 2 | L2₹11.4 LRejected-AOC | ₹11.4 L | L2 | Rejected-AOC Work awarded and agreement executed |
| Sl No | Description | Qty | Unit | Santhosh Kumar K.V. L1 | SANOOP L2 |
|---|---|---|---|---|---|
| 1.00Compound Wall | |||||
| 1.00 | OD99602/2025-2026:Demolishing Laterate masonry work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. | 14.26 | cum | 1,150 ₹16,394.40 | 1,500 ₹21,384 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 17.75 | cum | 1,600 ₹28,406.40 | 1,700 ₹30,181.80 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 32.15 | cum | 300 ₹9,646.20 | 300 ₹9,646.20 |
| 1.00 | OD70317/2025-2026:Dry rubble masonry using departmental rubble with out concrete levelling course ,Masonry with good quality blasted rubble including packing to compactness to lines and levels, cost and conveyance of all materials labor charge etc. Complete as per direction of departmental officers at site | 17.75 | cum | 1,180 ₹20,949.72 | 1,300 ₹23,080.20 |
| 1.00 | OD99594/2025-2026:
Dry Rubble masonry with hard stone in foundation and plinth including all cost of materials, all labour charges etc. complete | 13.86 | cum | 3,500 ₹48,510 | 3,700 ₹51,282 |
| 1.01 | OD280426/2025-2026:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level with
Cement mortar 1:6 (1 cement : 6 coarse sand) | 8.32 | cum | 6,500 ₹54,112.50 | 8,500 ₹70,762.50 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 27.84 | sqm | 290 ₹8,073.60 | 330 ₹9,187.20 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.25 | cum | 5,900 ₹25,063.20 | 6,300 ₹26,762.40 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,493.28 | kilogram | 83 ₹1.2 L | 90 ₹1.3 L |
Tender Value
₹12.7 L
EMD Value
₹31,855
Closing Date
3 Feb 2026, 3:00 pmClosed
Office of the Executive Engineer, PWD Buildings Di
The Executive Engineer, PWD Buildings Division, Kozhikode
GENERAL Bridges North Circle Kozhikode Providing gate and interlocked concrete paver blocks General Civil Work 1
2026_PWD_830859_1
65/EEBK/2025-26
Open Tender
Civil Works - Buildings
kozhikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹31,855
Yes
30 Apr 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
Compound Wall
OD99602/2025-2026:Demolishing Laterate masonry work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD70317/2025-2026:Dry rubble masonry using departmental rubble with out concrete levelling course ,Masonry with good quality blasted rubble including packing to compactness to lines and levels, cost and conveyance of all materials labor charge etc. Complete as per direction of departmental officers at site
OD99594/2025-2026: Dry Rubble masonry with hard stone in foundation and plinth including all cost of materials, all labour charges etc. complete
OD280426/2025-2026:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level with Cement mortar 1:6 (1 cement : 6 coarse sand)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
OD70319/2025-2026:Laterate masonry with neatly dressed departmental laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
OD70316/2025-2026:Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
OD71061/2025-2026:Providing and fixing 4mm thick Teak Veneer on plywood using synthetic adhesives ,neccessary screws ,Veneer to be provided only on visible surface,including all cost of materials all labour charges etc complete.
OD71064/2025-2026:Providing and fixing 12mm thick Marine plywood conforming to IS:710 in partition,shelves with screws and adhesive wherever required.
OD71138/2025-2026:Melamine polishing on woodwork (two coat)
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
50.17.1.1:Supplying and fixing Stainless steel soap dish including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
50.17.1.3:Supplying and fixing CP Towel rod 60cm or nearest available length including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
50.17.1.4:Supplying and fixing CP Health faucet good quality including cost of materials and labour charges etc. complete as per the direction of site engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1395968.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.64 MB
memo.pdf
Other Document • 0.23 MB
BOQ_1395968.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid