Loading…
Loading…
21,540 results • Best match
Construction of 6 Nos of Foot Over Bridges FOB on Achhad Dahisar Km 381 000 to Km 502 000 Section of NH 48 in the State of Maharashtra on EPC Mode
1 Construction of 6 Nos. of Foot Over Bridges (FOB) on Achhad-Dahisar (Km. 381.000 to Km. 502.000) Section of NH-48 in the State of Maharashtra on EPC Mode 144866334
Shifting of the existing 33 KV HT OH lines, towers near Pandava theertham which is obstable to newly constructing bridge for 4-lane road lead to ORR at Tirumala
Shifting of the existing 33 KV HT OH lines, towers near Pandava theertham which is obstable to newly constructing bridge for 4-lane road lead to ORR at Tirumala
Supply of GI Angles of different sizes suitable for fabrication of M type tower parts including cost of materials and labour for loading and unloading for all leads and lifts and stacking at the works shop and including transport and including of 10% of wastage etc., complete as per specification
Shifting of the existing 33 KV HT OH lines, towers near Pandava theertham which is obstable to newly constructing bridge for 4-lane road lead to ORR at Tirumala
Supply of GI Angles of different sizes suitable for fabrication of M type tower parts including cost of materials and labour for loading and unloading for all leads and lifts and stacking at the works shop and including transport and including of 10% of wastage etc., complete as per specification
REPAIRING OF BOTH SIDE WING WALL OF BRIDGE NEAR ICDS CENTRE NO 8 UNDER CHAMURCHI GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS. (SCHEME ID-APAS/01/021/241/0013)
1.00 BULBUL LAMA CONSTRUCTION (GSTN-NA) BID ID -10132025 100000.000 -0.100 99900.000 Ninety Nine Thousand Nine Hundred
Urgent Road repairing between Great Eastern electronics shop and 2nd Hooghly Bridge ramp of G.T. Road under Shibpur Sub Division under Howrah Division, PWD during the year 2025-26.