Loading…
Loading…
21,556 results • Best match
Shifting of the existing 33 KV HT OH lines, towers near Pandava theertham which is obstable to newly constructing bridge for 4-lane road lead to ORR at Tirumala
Supply of GI Angles of different sizes suitable for fabrication of M type tower parts including cost of materials and labour for loading and unloading for all leads and lifts and stacking at the works shop and including transport and including of 10% of wastage etc., complete as per specification
REPAIRING OF BOTH SIDE WING WALL OF BRIDGE NEAR ICDS CENTRE NO 8 UNDER CHAMURCHI GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS. (SCHEME ID-APAS/01/021/241/0013)
1.00 BULBUL LAMA CONSTRUCTION (GSTN-NA) BID ID -10132025 100000.000 -0.100 99900.000 Ninety Nine Thousand Nine Hundred
Urgent Road repairing between Great Eastern electronics shop and 2nd Hooghly Bridge ramp of G.T. Road under Shibpur Sub Division under Howrah Division, PWD during the year 2025-26.
Maintenance and repairing of HPI-T Street / Flood lights, High Mast Light excluding Trident and Decorative lights at Grand Trunk Road and Liluah Road Over Bridge under Bally Municipality for 6 months.
Maintenance & Repairing of HPI-T Street / Flood Lights, High Mast Light excluding Trident & Decorative Lights at Grand Trunk Road and Liluah Road Over Bridge under Bally Municipality.
Repair of pipe culvert on Metriki to AP Border road on Ch 1.10 Km in Sandur Taluk, Ballari District, Under 3054 (NP) MDR Bridges Maintenance for the year 2025-26.(Reserved for SC Category)
... ………………………….. is a reputed company with a good financial standing. If the contract for this work, namely.................................................................................... (Name of the work) is awarded to the above firm, we shall be able to provide overdraft/credit facilities ...
PL and compaction of 75mm thk (double layer) WMM, 75mm thk DBM and 40mm thk BC, applying prime coat over WMM surf and applying tack coat for BC and road marking with thermoplastic paint for surf wks btwn Km 21.68 to Km 29.954 on rd Tangste to Kela So
Providing, laying and compaction of Wet Mix Macadam (WMM) layer compacted thickness 75 mm thick (Double Layer) confirming to Section 406 of MoRT&H specification for road and bridge Works (5 th Revision) for surfacing works between Km 21.680 to Km 29.954 on Tangtse to Kela Tso road