Loading…
Loading…
21,569 results • Best match
S.T.M.C. work 3.00M., 3.75 M. and 5.50M. BT and CC ROADS UNDER PWD SUB DIVISION CHURHAT, Distt. Sidhi PWD Road and Bridges SOR w.e.f 11-04-25
eProcurement System Government of Madhya Pradesh Created By: Muneem Kumar Parte Created Date/Time: 06-Apr-2026 02:33 PM Tender Title: S.T.M.C. work 3.00M., 3.75 M. and 5.50M. BT and CC ROADS UNDER PWD SUB DIVISION CHURHAT, Distt. Sidhi PWD Road and Bridges SOR w.e.f 11-04-25 Tender ID: 2025_PWDRB_471141_1
GENERAL AMC PWD Building Sub Division Section Roads Sub Division Section and Bridges Section KottarakkaraAnnual Maintenance Contract of Electrical Installation for the Financial Year 20252026 General Electrical Work
Work Name:GENERAL-AMC-PWD Building Sub Division, Section, Roads Sub Division, Section and Bridges Section Kottarakkara-Annual Maintenance Contract of Electrical Installation for the Financial Year 2025-2026 -General Electrical Work
Please Refer to BOQ.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
REPAIRING OF DAMAGED ROAD SURFACE AT PAHARPUR ROAD NEAR PRE. NO. N 130/A, N-119, N-99 ETC IN WARD NO-133, BR-XV
... cleaning of chips and preparing a uniform and quality mix, transporting the hot mix to work site, laying the mixed materials at specified laying temperature as specified in Table ...
REPAIRING OF ROAD AT GIRISH CH AVENUE BAGBAZAR STREET AND SURROUNDING AREAS UNDER BR I
... means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i)For WBM / WMM Surface:...(with primer @ 0.70-1.0 kg/sqm)(Rate... Surface:...(with primer @ 0.70-1.0 kg/sqm)(Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.01))
REPAIRING OF ROAD FROM JN OF RABINDRA SARANI AND SOVABAZAR STREET TO 495 RABINDRA SARANI (ALONG RABINDRA SARANI) UNDER BR I
... means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i)For WBM / WMM Surface:...(with primer @ 0.70-1.0 kg/sqm)(Rate... Surface:...(with primer @ 0.70-1.0 kg/sqm)(Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.01))