Loading…
Loading…
15,978 results • Best match
Repair to Bridge over local Nallah on Sarat to Dugdha Road for the year 2025-26.
eProcurement System Government of Odisha Created By: Satyabrata Nayak Created Date/Time: 11-Feb-2026 09:05 PM Tender Title: Repair to Bridge over local Nallah on Sarat to Dugdha Road for the year 2025-26. Tender ID: 2026_CERWI_125185_6
Repair of Naraini Minor Bridge on Saitha Vishesharganj ODR Km-8
eProcurement System Government of Uttar Pradesh Created By: SHAILENDRA KUMAR Created Date/Time: 10-Dec-2025 07:04 PM Tender Title: Repair of Naraini Minor Bridge on Saitha Vishesharganj ODR Km-8 Tender ID: 2025_CEUFZ_1090339_3
Repair V.R. Bridge at Km 3.960 of Experimental Channel (Re-invited)
THE ROYAL COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD SOHANSARA (GSTN-NA) BID ID -1461858
Re-construction of RCC Box Bridge
Re-Construction of RCC Box Bridge at village Kheri across Water Body with flash flood on Link Road Kheri to Haryoli in Distt. Panchkula
Maintenance work of the bridge on Jauraha Nale bridge at Bilraiyan- Panwari road (SH-21) Km-5
GENERAL-TDY/2025-Bridge safety work of Mankayam and Koottakara Bridge in Thiruvambady LAC in Kozhikode District
OD213105/2024-2025:Microconcrete Reinstatement for thickness more than 50mm for RCC members:- Providing and laying of special repair material micro-concrete for reinstatement of members having thickness of repair more than 50mm and jacketing, using Single component, high strength, high flow cementitious micro-concrete having compressive strength minimum of M40 at 28 days such as MasterEmaco 346 or Renderoc RGL / RGS of Fosroc or equivalent, blended with washed saturated surface-dry (SSD), graded, low absorption, high density, aggregates of size 3mm to 10mm at 50% by weight of micro concrete (if thickness is 100mm or more) and water as per data sheet and pouring into the shuttering if required than use birds beak type form work using suitable arrangement or if required using pumping device for uniform flow of Microconcrete. The side shuttering can be removed after Minimum of 24 hours, preferably 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant. (Payment shall be made in Sq.M for thickness upto 100mm of Microconcrete of area repaired, ) including shuttering work (Only steel reinforcement shall be paid in other relevant items)