Loading…
Loading…
15,978 results • Best match
Construction of bridge over Bonda(Bondajore) Nallah at 2.00Km on Talasara to Rengali Road
Earthwork in excavation for bridge works in all kinds of soil, by mechanical means utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge.
Repair of Chandaha Nala Bridge Situated on Dhongawa link road in District Gonda
Providing and applying epoxy mortar over honey combed, spelled concrete surface and reinforcement inside and outside surface of RCC structure by epoxy grouting and injection process including cost of nipple, making V groove and plaster with epoxy mortar over the cracks as per MORT&H specification for road & bridge work section 2800. The work includes cost of removal of defective material, cleaning the surface thoroughly and applying of materials as per specification, labour, T&P scaffolding, arrangements required for proper completion of work as per specification & direction of engineer in charge.
CONSTRUCTION OF WOODEN BRIDGE AT BONHIJLI RANG PARAUNDER MAROKHANA G P BOOTH NO 281
eProcurement System of Government of West Bengal hosted at WB-SDC Created By: pinaki chakrabarty Created Date/Time: 06-Jan-2026 03:10 PM Tender Title: CONSTRUCTION OF WOODEN BRIDGE AT BONHIJLI RANG PARAUNDER MAROKHANA G P BOOTH NO 281 Tender ID: 2025_ZPHD_5001782_1
Repairing work of flyover bridge -Hapur side- on the Meerut-Bulandshahr Road -ODR- Hapur City Portion in district Hapur
Construction of Master Plan Road (4- Lane) C.C. Road From Saliya to Babadiya (Bilkhiriya) Khurd Road Length 2.20 Km PAC RS. 1097.90 LACS First call on on Road and Bridge S.O.R. wef 11-04-25 Work Period 330 days i/c rainy season
Construction of Master Plan Road (4- Lane) C.C. Road From Saliya to Babadiya (Bilkhiriya) Khurd Road Length 2.20 Km PAC RS. 1097.90 LACS First call on on Road and Bridge S.O.R. wef 11-04-25 Work Period 330 days i/c rainy season
94094-Beautification work from mahape bridge to digha Thane Belapur Road.
94094-Beautification work from mahape bridge to digha Thane Belapur Road.