Loading…
Loading…
15,964 results • Best match
BORING WORK FOR PREPARING DPR OF PROPOSED/BUDGETED WORK IN RIVERS AND NALLAS UNDER PWD BRIDGE SUB DIVISION SIDHI MP
Tender Inviting Authority: EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT BRIDGE CONSTRUCTION DIVISION REWA
In this proposal, second phase dredging is proposed in the channel from Neendakara bridge to Dhalavapuram Bridge, for a length of 2.00km and an average width of 100m, dredged to an average depth of -3.50m CD.
OD5607/2023-2024:Dredging and deepening harbour basin in all classes of soil using any type of dredger such as grab dredger, hopper bottom type dredger, cutter suction type dredger /any type of dredging equipment and removing sand, clay, silt, debris, piece of nets, other waste or mixture or combination of two or more including removing all obstacles such as small rocks scattered granite, wood pieces, piece of net etc and dumping the spoil at location already pointed out by the departmental officers with a lead up to a radial distance of 2000 m and protected by reclamation bund using plastic woven empty cement bag filling it with sea sand/ dredged spoil, stitching with nylon yarn and making it suitable for conveying, dumping and placing the bags in required lines, shape and levels to form reclamation bund, including hire charges of dredger , all tools and plants and accessories ,fuel charges, idling and mobilization charges, demobilization charges, and all type of Survey works, providing and shifting the pipe lines all labour charges, incidental charges etc. complete to an average depth of (-) 4.00m CD with a tolerance of +/- 20 cm and cost of formation of reclamation bund including labour charges for filling and stitching bag and conveying and placing in the required lines, shape and levels etc. complete as per the direction of departmental officers at site
Construction of cabin for Weigh Bridge in NP
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil
Package No. - CE/EAP/ARRBP/OCB/Bridge Kokrajhar/12 Construction of R.C.C bridge No 5/1 on Poatgaon Simbargaon Road
Air quality monitoring at 3 locations for 1 season for 1 year. (Pre-Construction Stage) i) Bridge No. 5/1 on Poatgaon Simbargaon Road.
Work of repairing of damaged electrical wiring of weigh bridge no. 1,5,7,8,12,13 ,14 at different location under Ashok OCP, Piparwar Area.
Baldeep Construction (BID ID -1195641)
Civil work
Protection works