Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 CrAccepted-AOC | ₹9.2 Cr | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SoorajkumarKV L1 |
|---|---|---|---|---|
| 1.00Appendix-A-Dredging | ||||
| 1.00 | 65.91:Dredging and deepening harbour basin in all classes of soil using any type of dredger such as grab dredger, hopper bottom type dredger, cutter suction type dredger /any type of dredging equipment and removing sand, clay,silt, debris, piece of nets, other waste or mixture or combination of two or more including removing all obstacles such as small rocks scattered granite, wood pieces, piece of net etc and depositing this material using bottom open barge and conveying this to sea beyond 3 km and upto 5 km for depositing in sea , as per the direction of departmental officers at site including all hire charges of tools, plants, equipments, accessories, incidental charges, labour charges and all service taxes etc complete. for dredging upto -4.5m bedlevel with respect to CD | 2,32,600 | cum | 243.5 ₹5.7 Cr |
| 1.00 | OD5607/2023-2024:Dredging and deepening harbour basin in all classes of soil using any type of dredger such as
grab dredger, hopper bottom type dredger, cutter suction type dredger /any type of dredging
equipment and removing sand, clay, silt, debris, piece of nets, other waste or mixture or
combination of two or more including removing all obstacles such as small rocks scattered
granite, wood pieces, piece of net etc and dumping the spoil at location already pointed out by
the departmental officers with a lead up to a radial distance of 2000 m and protected by
reclamation bund using plastic woven empty cement bag filling it with sea sand/ dredged spoil,
stitching with nylon yarn and making it suitable for conveying, dumping and placing the bags in
required lines, shape and levels to form reclamation bund, including hire charges of dredger , all
tools and plants and accessories ,fuel charges, idling and mobilization charges, demobilization
charges, and all type of Survey works, providing and shifting the pipe lines all labour charges,
incidental charges etc. complete to an average depth of (-) 4.00m CD with a tolerance of +/- 20
cm and cost of formation of reclamation bund including labour charges for filling and stitching
bag and conveying and placing in the required lines, shape and levels etc. complete as per the
direction of departmental officers at site | 1,49,500 | cum | 243.5 ₹3.6 Cr |
Tender Value
₹8.5 Cr
EMD Value
₹2 L
Closing Date
4 Mar 2024, 6:00 pmClosed
Superintending Engineer, HESC
Superintending Engineer, HarbourEngineering South Circle, Kamaleswaram, Manacaud (PO),Thiruvananthapuram-9
In this proposal, second phase dredging is proposed in the channel from Neendakara bridge to Dhalavapuram Bridge, for a length of 2.00km and an average width of 100m, dredged to an average depth of -3.50m CD.
2023_HED_633401_2
HED/CEHED/TR/1151/2023_5_1_1/1
Open Tender
Civil Works - Others
365 days
Neendakara
Please refer Tender documents.
17 documents required · 17 mandatory
₹11,025
₹2 L
Yes
2 May 2026
5 Feb 2024
6 Mar 2024
5 Feb 2024
4 Mar 2024
5 Feb 2024
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 4.61 MB
BOQ_1010345.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid