Loading…
Loading…
16,810 results • Best match
RELAYING AND PAINTING OF ROAD KERB AND CHANNEL AND OTHER ALLIED WORKS BIJON SETU BRIDGE APPROACH IN WARD NO-68
1.00 MESSERS AKREETI CONSTRUCTION (GSTN-19ACXPB3280AIZ0) BID ID -7335089 189454.56 4.99 198908.34 One Lakh Ninety Eight Thousand Nine Hundred and Eight
Re-Construction of wooden bridge Somruk in place of damage wooden bridge over Kashmul Khal G.P-Hutgacha-II, P.S-Uluberia, Block-Uluberia-I, District-Howrah.
Labour charges for taking out old wood work including cutting bolts and nuts and stacking within a lead of 100 metre etc. complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels)
Providing and Installation of Wet well Sewage type Submersible Pumping Machinery and allied electro mechanical works at Dwarka Bridge Lane, Tarapith Near Dwarka Bridge Block-Rampurhat-I under Bolpur Mechanical Division, PHE Dte
Making inter connection of the pump delivery line with Single Rail GR Pipe, Pedestal Auto Rail Coupling, Single Rail GRP Coupler to laid sewage pump collecting main line near the well with above supplying and fixing of 100 mm dia. Heavy type MS. black pipe, bend, 100 mm dia. M.S. flange with necessary drill holes and other necessary M.S. specials as may be reqd as per site situation and painting as required for all installation to complete the work including cutting pipes, making bend, delivery common header, thread and welding the all joints (3run) properly if necessary and supplying necessary nuts bolts, washer, rubber insertion etc. to complete the work as per direction and testing & commissioning of the above supplied pump & motor completion of work as per relevent Hydraulic Standards & IE rules and upto entire satisfaction of EIC. This including construction of pipe supports / valve supports with Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) including shuttering and reinforcement,if any, including after Dismantling all types of masonry , cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed as per direction as well as Installation of main switch, changeover, busbar chamber etc. Installation of Electrical Control panel along with Pump Monitor Unit suitable for said pump and other pump motor related protection accessories etc. all electrical equipment within the pump house, drawing of cable properly on suitable size GI cable tray on wall / as per direction of EIC as per layout & IE rules and all connection with supply necessary materials, cable etc to complete the work, making arrangement with supply & fixing of materials for taking power within the pump house from WBSEDCL end as per direction of EIC.
CONSTRUCTION OF HEAD SHED AT BURI MANDAP TAMAL SARKAR HOUSE , CONSTRUCTION OF CC ROAD FROM CC ROAD TO HARAN SAHA HOUSE ) , CONSTRUCTION OF PILLING AND REPAIRING OF CC ROAD INFRONT OF WOODEN BRIDGE , REPAIRING OF BIJLIPARA ICDS CENTRE
CONSTRUCTION OF FOUR LINE ROAD FROM BANGRASIA - BHOJPUR ROAD LENGTH 7.00 KM. PAC 3495.69 lacs First Call on Road and Bridge SOR 25-03-2022 work period 540 days I/C rainy seoson
Geotechnical Investigation for the work, Construction of 1 One no. R.C.C. Bridge over Kubai Burigang river at Palangpur and Gaighata, in Block and PS Keshpur Dist.Paschim Medinipur in connection with Ghatal Master Plan