Loading…
Loading…
16,895 results • Best match
CONSTRUCTION OF FOUR LINE ROAD FROM BANGRASIA - BHOJPUR ROAD LENGTH 7.00 KM. PAC 3495.69 lacs First Call on Road and Bridge SOR 25-03-2022 work period 540 days I/C rainy seoson
Geotechnical Investigation for the work, Construction of 1 One no. R.C.C. Bridge over Kubai Burigang river at Palangpur and Gaighata, in Block and PS Keshpur Dist.Paschim Medinipur in connection with Ghatal Master Plan
Construction of C.C.Road from Itawa Khurd to Doglapani Road Length 4.50 Km PAC 768.19 lacs First Call on Road and Bridge SOR 11-04-25 work period 450 days I/c rainy season
Construction of Road from ImlaChowki to Harrakheda , Dhamarra Road Length 8.500 Km. PAC 1622.81 lacs First Call on Road and Bridge SOR 25-03-22 work period 450 days I/c rainy season
Construction of Submersible Bridge Including Approach Road Across Chhonch River between Village Mehgonabada and Rasulla Bujurg in District Shivpuri
eProcurement System Government of Madhya Pradesh Created By: PREM CHANDRA VERMA Created Date/Time: 16-Dec-2025 06:25 PM Tender Title: Construction of Submersible Bridge Including Approach Road Across Chhonch River between Village Mehgonabada and Rasulla Bujurg in District Shivpuri Tender ID: 2025_PWDRB_452042_1
The proposed work from Panampalam Bridge to Varimuttu place for a total length of 2334 meters.
OD42759/2025-2026:Earth work in excavation for removal of silt by mechanical means using sophisticated equipments like amphibions excavator or any equivalent mechanical equipment with necessary accessories like transport barges, mechanized boats etc as appropriate and as directed for desilting rivers, to the desired depth to ensure free flow in the river including getting out and disposal of excavated earth with lead upto 50 m as directed by Engineer-in-charge. The rate shall include disposal of excavated earth/clay, temporary storage of all materials on the banks or other suitable locations by means of loaders/tippers/mechanized boats etc as appropriate as directed. The rate shall include all the charges for labour, equipments, conveyance of materials, incidentals, all taxes, duties, GST complete as per the directions of the Engineer in Charge for fulfilling the final objective of removing all obstructions and to ensure free flow of water in the river.