Loading…
Loading…
16,896 results • Best match
The proposed work from Panampalam Bridge to Varimuttu place for a total length of 2334 meters.
OD42759/2025-2026:Earth work in excavation for removal of silt by mechanical means using sophisticated equipments like amphibions excavator or any equivalent mechanical equipment with necessary accessories like transport barges, mechanized boats etc as appropriate and as directed for desilting rivers, to the desired depth to ensure free flow in the river including getting out and disposal of excavated earth with lead upto 50 m as directed by Engineer-in-charge. The rate shall include disposal of excavated earth/clay, temporary storage of all materials on the banks or other suitable locations by means of loaders/tippers/mechanized boats etc as appropriate as directed. The rate shall include all the charges for labour, equipments, conveyance of materials, incidentals, all taxes, duties, GST complete as per the directions of the Engineer in Charge for fulfilling the final objective of removing all obstructions and to ensure free flow of water in the river.
Reconstruction work of Minor Bridge at km 1 of Harnol to Virbala Road in District Mathura
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MORT&H Specification no. 12.1 (304).
Estimate for Balance work for Reconstruction of fall-cum bridge at RD 12000 of Kishanpura Disty
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21
Construction of road from Tarigam to HS Bugh including construction of 1x48 Mtr Span Truss Girder Bridge
Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. All works above plinth level upto floor V level
Construction of Bridge in Biswanath district i) Br. No. 2/1 on Kukurachua to khutikotia Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Biswanath/29
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling the excavated tearth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Upto 3m depth i) Bridge No 2/1 of Kukurachua to khutikotia Road
Construction of Bridge in Biswanath district i) Br. No. 1/1 on Gopalpur to Tinialibori Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Biswanath/30
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling the excavated tearth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Upto 3m depth i) Bridge No 1/1 of Gopalpur to Tiniali bori Road