Loading…
Loading…
16,761 results • Best match
Protection work on MF Road to Gangora Link Road Bridge in Distt. Shahjahanpur Fin. Year 2025-26
Earthwork in excavationof Foundation of structures as per drawing and technical specifications Clause 304 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling with approved material.
KDP- Puthiyakandam VCB cum Bridge- Reconstruction of VCB cumBridge at Puthiyakandam in Madikai Grama Panchayat- Investigation Work
60.11.1:FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high "TBM" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.
Renewal work of Sarwan to Shakurabad ( Kalyani River Bridge approach) Link Road in Block Nindura, District Barabanki.
Auction of Silt/soil work from Km 113.458 (Lakhana New Bridge) to Km 115.000 of Bhognipur branch
Concrete is being poured from NH-206 into the premises of Shri Madh Rambhapuri Hiremath in Doddaguni village. Repair of the damaged bridge on the road leading from Gubbi C.S. Pura Road to Chikkakunnala Kunnala G P , Laying of cement concrete in the ... and construction of ... house Construction of ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Repairs to Bridge at Km 131.50 on SH 40 near Yeshwanthnagar Village in Sandur Taluk, Ballari District, Under 3054 (NP) SH Bridges Maintenance for the year 2025-26.(Reserved for General cateogory)
This is to certify that M/s. ………………………….. is a reputed company with a good financial standing. If the contract for this work, namely.................................................................................... (Name of the work) is awarded to the above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. …………....../- (inwards) .................................................................... ..... to meet the working capital requirements for executing the above contract