Loading…
Loading…
16,787 results • Best match
Construction of road from Hada Gadia Bridge to Charan Pradhan House in Ward No 01
Re-construction of VR Bridge at RD 2200 of KCB drain to remove flow obstruction
HSR Item [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
Construction of Bridge in Charaideo District i) Br No. 2/1 on Litinga Basti Road
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Manual Means
Construction of Bridge in Majuli district (i) Br No 1/1on Kuhiarbari to Morsutigaon Road
Excavation for Structures, Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material, I. Ordinary Soil, B Mechanical Means with dewatering i) Depth upto 3 m
Construction of a covered RCC drain from Jheel Bridge to Star Hospital in Mohalla Kahran
Providing & laying cement concrete 8:4:1(1 Cement: 4 fire sand: 8 graded brick aggregate 40 mp Goncrete with 40 mm Gauge Brick blast with nominal size) including supply of all materils, labour and tools and plantas etc. requirad for proper completion of the work (SI No. 275)
Construction of Bridge in Golaghat District i) Br. No.1/1 on Dusutirmukh Hospital Road
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Manual Means (B) RCC