Loading…
Loading…
15,803 results • Best match
Repair Work of Abutment Piers of the Bridge at Km 65.00 Hunusur Talcavery State Highway Madikeri Taluk
REPAIR WORK OF RANJ RIVER BRIDGE LOCATED AT KM 4 OF PUKARI LINK ROAD IN BANDA DISTRICT
Removal of Vegitation / Plants, Removal of entier root inside the bridge portion. Remains of the root shall be treaded with special chemical treatment.(as per thespecification and Dorected by Engineer /incharg with prior approval of concerned Supritending Engineer.)
Repair of Major bridge on Kathina River at Km. 18 on Neri Sidhauli Mahmudabad Road (Civil Work)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Repair work of Ainchwara bridge located at Km 8 of Khoh Manikpur Road (ODR) in Chitrakoot district
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. SI No 255
REPAIR WORK OF RANJ RIVER BRIDGE LOCATED AT KM 4 OF RENHUCHI LINK ROAD IN BANDA DISTRICT
Removal of Vegitation / Plants, Removal of entier root inside the bridge portion. Remains of the root shall be treaded with special chemical treatment.(as per thespecification and Dorected by Engineer /incharg with prior approval of concerned Supritending Engineer.)
Repair and safety work of Railway Over Bridge (ROB) located at Km 6 of Fulwaria Bypass ODR
Mild steel or iorn work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shapes as necessary and bending for the proper coppletion of the work and including supply of steel and its wastage etc. and all labour and tools and plants required for proper completion of work Note: the steel shall be bent cold and bends hooks and authorised over lapping shall be measured.