| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | ₹4.3 L Quoted ₹4.6 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹4.6 L+₹4,117.16 (0.90%)Rejected-AOC | ₹4.6 L+₹4,117.16 (0.90%) | L2 | Rejected-AOC L2 Bidder |
| Sl No | Description | Qty | Unit | A.V GEORGE L2 | ARUN RAJ T R L1 |
|---|---|---|---|---|---|
| 1.00Maintenance of Steel bridges | |||||
| 1.00 | 13.91:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 223.78 | sqm | 72.01 ₹16,114.11 | 71.37 ₹15,970.89 Lowest |
| 1.00 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 591.69 | kg | 6.44 ₹3,810.51 | 6.38 ₹3,775.01 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.51 | cum | 10,157.81 ₹25,526.58 | 10,067.21 ₹25,298.9 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 4.02 | sqm | 424.7 ₹1,707.29 | 420.91 ₹1,692.06 Lowest |
| 1.00 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,183.39 | kg | 154.72 ₹1,83,093.79 | 153.34 ₹1,81,460.72 Lowest |
| 1.01 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | 248.03 | kg | 248.57 ₹61,651.82 | 246.35 ₹61,101.21 Lowest |
| 1.01 | 13.65.1:Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 351.33 | sqm | 158.74 ₹55,769.81 | 157.32 ₹55,270.92 Lowest |
| 1.01 | 13.53.1:Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to given an even shade:New work (two or more coats) including coat of approved steel primer but excluding a coat of mordant solution. | 351.33 | sqm | 207.15 ₹72,777.6 | 205.3 ₹72,127.64 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 20 | sqm | 406.67 ₹8,133.4 | 403.04 ₹8,060.8 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,482
Closing Date
3 Mar 2026, 6:00 pmClosed
Vijeshraj P R
Office of the Assistant Executive Engineer, Inland Navigation Subdivision, Varkala
GENERAL-Steel bridge Renovation- Renovation of steel bridges at Thazhevettor and Onnampalam- Varkala-General Civil Work
2025_Irrig_817043_2
IRR/KP/4229/2025 2026
Open Tender
Civil Works - Others
Item Rate
120 days
Thazhevettor and Onnampalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹925
Yes
₹10,482
Yes
4 Aug 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
3 Mar 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance of Steel bridges | |||||
| 1.001 | 13.91:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 0.4 | sqm | - | - |
| 1.002 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 0.6 | kg | - | - |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.004 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1 | sqm | - | - |
| 1.005 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 0.2 | kg | - | - |
| 1.006 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | 0.4 | kg | - | - |
| 1.007 | 13.65.1:Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 0.2 | sqm | - | - |
| 1.008 | 13.53.1:Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to given an even shade:New work (two or more coats) including coat of approved steel primer but excluding a coat of mordant solution. | 0.2 | sqm | - | - |
| 1.009 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1419077.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1419077.xls
BOQ • 0.30 MB
nit23.pdf
Other Document • 0.03 MB
bid1.pdf
Tender Documents • 1.81 MB
date2.pdf
PDF • 0.63 MB
datecorri.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .