Loading…
Loading…
18,333 results • Best match
Construction of Bridge in Biswanath district i) Br. No. 4/1 on Buroi TE 14 no Line to Behali Line Tiniali Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Biswanath/23
Elastomeric Slab Seal Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specification to be installed by the manufacture / supplier or their authorisedrepresentative ensuring compliance to the manufacturers instructios for nstallation and clause 2506 of MORTS&H specification of bridge works.) i) Bridge No 4/1 of Buroi TE 14 no Line to Behali Line Tiniali Road
Construction of Bridge approach road for RCC Bridge No. 1/1 on road Borobojar to Barjhar road under SOPD(G) for the year 2025-26 under Udalguri (R and B) Division.
BRIDGE PROTECTION WORK 14.5(i) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I) Stone/Boulder.
Construction of New A Site Retail Outlet with facilities like Sales Building Paver block Canopy Driveway and other allied civil and electrical works at location from Mangala Hata bridge to Brahmagiri on LHS on NH316 Dist Puri under Bhubaneswar Divisi
New Construction of Fareedpur Nizam to Nehar Ke Bridge to Junior High School Fareedpur Nizam Road
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, Using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
AKALAKUNNAM G.P-316/25-CONSTRUCTION OF BRIDGE AT KALARICKEL CHERUKARAKUNNEL BHAGAM OF CHENGALAM KDAKUZHY THODU
2.5.2.B:Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (II) By Mechanical Means (B) Reinforced Cement Concrete
Construction of Foot over Bridge at Kachnavda under submergence of Navnera Barrage Project Dist. Kota
Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm (For mix design Cement content considered 320 kg/ cum of concrete)