| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹70.8 LAdmitted-Finance 00 VIBHAV NAGAR COLONY NAVIPUR KALAN NAVIPUR KALAN HATHRAS UTTAR PRADESH 204101 | HATHRAS | UTTAR PRADESH | 204101 | L1 | Admitted-Finance | ||
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received | ||
| 5 | Not Admitted-Fee/PreQual/Technical VPO NEAR ARYA SAMAJ KHERA RASOOLPUR KOTA | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹73.4 L
EMD Value
₹1.5 L
Closing Date
11 Mar 2026, 6:00 pmClosed
EE WR NAVNERA PROJECT DIV. I KOTA
EE WR NAVNERA PROJECT DIV. I KOTA
Construction of Foot over Bridge at Kachnavda under submergence of Navnera Barrage Project Dist. Kota
2026_WRDAS_543401_6
EE WR NAVNERA PROJECT DIV. I KOTA NITNO-12/2025-26
Open Tender
Civil Works
Percentage
90 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
1000 EE WR NAVNERA PROJECT DIV. I KOTA
₹1.5 L
Yes
13 Mar 2026
1 Mar 2026
12 Mar 2026
1 Mar 2026
11 Mar 2026
1 Mar 2026
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard/Dense soil
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Soft / Disintegrated rock
Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm (For mix design Cement content considered 320 kg/ cum of concrete)
Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm (For mix design Cement content considered 420 kg/ cum of concrete)
Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using.
Side shuttering including propping etc. complete (to achieve finish F 2) for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete)
Centering and shuttering for piers, galleries, barrels, intake well, sluice well upto 3.0m height from base/floor level (To achieve F2 finish)
Back filling behind abutment, wing wall and return wall, in 150mm layers, with mechanical compaction, complete with all lead and lift, as per drawing and technical specification. [MoRTH Specification : Clause 304] sandy material
Extra Charges For using Mobile Transite Mixer (i.e Flori)
Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement.
In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete)
Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
BOQ_968896.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .