Loading…
Loading…
20,066 results • Best match
Construction Of Approch road with Bridge to Gadegaon Road KM. 0/000 To 2/500 VR 37 Tq. ,Dist.Nanded
eProcurement System Government of Maharashtra Created By: SANJAY KISHANRAO SHINDE Created Date/Time: 26-Dec-2025 06:49 PM Tender Title: Construction Of Approch road with Bridge to Gadegaon Road KM. 0/000 To 2/500 VR 37 Tq. ,Dist.Nanded Tender ID: 2025_NANDE_1260300_1
Construction of Road from Raghunathpur Bridge to Uday Kr. Shaw house, Ward No-01, Borough-01, Booth No-14
eProcurement System of Government of West Bengal hosted at WB-SDC Created By: BALJIT SINGH Created Date/Time: 21-Jan-2026 02:40 PM Tender Title: Construction of Road from Raghunathpur Bridge to Uday Kr. Shaw house, Ward No-01, Borough-01, Booth No-14 Tender ID: 2026_MAD_5006369_6
Construction Of HL RCC Bridge Between Village Kerasai And Bazargora In Tangrain Panchayat In Potka Block East Singhbhum District
eProcurement System Government of Jharkhand Created By: Shridhar Shambhu Rajak Created Date/Time: 18-Sep-2024 04:52 PM Tender Title: Construction Of HL RCC Bridge Between Village Kerasai And Bazargora In Tangrain Panchayat In Potka Block East Singhbhum District Tender ID: 2024_RDSPL_89141_1
CONSTRUCTION OF FOOTPATH (PAVER BLOCK) FOR PROTECTION OF PEDESTRIAN NEAR SANTOSHPUR ZORA BRIDGE IN WARD-109, BR- XII, KMC.
3.00 K N CONSTRUCTION (GSTN-NA) BID ID -10108825 498453.63 0.00 498453.63 Four Lakh Ninety Eight Thousand Four Hundred and Fifty Three
CONSTRUCTION OF SAKAV (MINOR BRIDGE) ON MAUJE GANJE VANDRI CANAL NEAR LAND OF RAJU DHOTRE ROAD IN TALUKADISTRICT PALGHAR
CONSTRUCTION OF SAKAV (MINOR BRIDGE) ON MAUJE GANJE VANDRI CANAL NEAR LAND OF RAJU DHOTRE ROAD IN TALUKA DISTRICT-PALGHAR.
Construction of Retaining wall at Hurla Bridge Approach Road of Parbati-H.E. Project (Stage-II) (Package No-C-838)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Hard rock (blasting prohibited)