Loading…
Loading…
20,064 results • Best match
S- 700/2024 Construction of Approach Road of Kannangattu - Madura Company bridge in division 13,14 ,15 of Palluruthy Zonal
OD39378/2024-2025:Providing and constructing gabian structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross ...
Construction of road from Surkhali bridge to sadal primary school Under Khargram Block (Length of the Road 5.300 Km)
Name of the work under Administrative Block : Construction of road from Surkhali bridge to sadal primary school Under Khargram Block (Length of the Road 5.300 Km)
Construction of an RCC drain on Basti Kate Road in Munderva Nagar Panchayat, from ITI School towards Budha Bridge.
Construction of an RCC drain on Basti Kate Road in Munderva Nagar Panchayat, from ITI School towards Budha Bridge.
Construction of road from Latakuri Bartala to Nonai Bridge under Bharatpur-I Block (Length of the Road 1.796 Km)
Name of the work under Administrative Block : Construction of road from Latakuri Bartala to Nonai Bridge under Bharatpur-I Block (Length of the Road 1.796 Km)
Dima Hasao/17 Construction of Bridge in Dima Hasao District i) Br. No. 9/1 on Nabladisa Simthuilong Road
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m Br. No. 9/1 Nablaidisa Simthuilong Road (Span 1 x 10.9)
Dima Hasao/16 Construction of Bridge in Dima Hasao District i) Br No. 10/1 on Asalu Wadrengdisa Road
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (ii) Depth 3 m to 6m Br. No. 10/1 on Asalu Wadrengdisa Road (Span 1 x 15)