Loading…
Loading…
15,787 results • Best match
GENERAL-Construction of Periya Vattoli Bridge in Mananthavady Constituency in Wayanad district-General Civil work-General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Repair and approach protection work of the Major bridge on Sarai River at Km. 10 of Hargaon Dateli Piperjhala Road (Civil Work)
Painting or vanishing on iron works in small areas or new wood work with one coat of ready mixed priming paints & two coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of work. paint to be used should confirm to the I.S.I. No 03-1950. (641+642)
Memo No. 876 /EE-E/NKDA/ Elect/ 2025-26-Serial 05- Repair/Replacement and re-fixing of street light, cable works and other connected work at Street No 272, 303,316, 276, 301,314,324,322,295, 255,303, Bagjola Canal to Jatragachi Bridge
NIVALI-WBS...M and R to Nivali WSS.... Repairs and Strengthening of CLF Bridge, Replacement of Flash Mixer along with allied works at WTP Nivali.
Repairs and strengthening of bridge Walkway : - Replacing all the corroded and worn out parts by new m. s. parts with G.I. coating and bolted by G.I. hardware the bridge walkway shall be designed for self load, flocculator load, the suspender load and live load confirming to IS. The walkway shall have a width not less then 1.00 Mtr and shall cover full diameter of flocculator on both sides of the central shaft and extend up to the outside diameter of the clarifier tank. The walkway shall accommodate two numbers paddle type flocculator assemblies suitably located on either side of the central column. The walkway bridge shall be supported on two supports only , one at the centre of the tank on the central brg. Assembly at the centre of the tank and the other on the traction trolley on the launder beam. The walkway shall have G.I. railing of 1 mtr. Height on both the sides along its total length. The walkway shall be covered with chequered plate. The entire structure shall be sand blasted, pickled and then epoxy painted/galvanized etc. complete.
Repair work of protective work on the approach road of the bridge located on the Kali river in village Pithalokar in Meerut district
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3. .for slabs. lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra As per sor si no 284
CONSTRUCTION OF PERMANENT RCC BRIDGE OVER RIVER ADAYAR AT OTA CHENNAI (PH II) (SPL WORK) (EXTERNAL ELECTRIC AND WATER SUPPLY) AND SPL REPAIR REPLACEMENT AGAINST QTY 06 X SPLIT AIR CONDITIONER DECLARED BER SQAE (V) CHENNAI UNDER GE STM
M & L for cutting in position existing 150 mm DI/CI water mains and inserting CI/DI bend for diversion in position the ductile iron pipes 150mm dia, supply and connecting of suitable bend including all ends, spigots complete as required as per site condition run lead joints, gaskets, nuts & bolts, washers etc. including excavation and earth work in any type of strata complete all as specified and as directed.