Loading…
Loading…
20,222 results • Best match
TEMPORARY RIVER TRAINING WORKS ALONG LEFT BANK OF RIVER GANGA D/S OF SHASTRI BRIDGE , FROM CH 850.00 M TO 950.00 M IN MAGH MELA 2025-26
Earth work in cutting slope of river banks in all types of soil with all lead and lifts including all labour and T & P etc. required for proper completion of works as per direction of Engineer-in-charge.
TEMPORARY RIVER TRAINING WORKS ALONG LEFT BANK OF RIVER GANGA U/S OF SHASTRI BRIDGE , FROM CH 735.00 M TO 835.00 M IN MAGH MELA 2025-26
Earth work in cutting slope of river banks in all types of soil with all lead and lifts including all labour and T & P etc. required for proper completion of works as per direction of Engineer-in-charge.
TEMPORARY RIVER TRAINING WORKS ALONG LEFT BANK OF RIVER GANGA U/S OF SHASTRI BRIDGE , FROM CH 625.00 M TO 725.00 M IN MAGH MELA 2025-26
Earth work in cutting slope of river banks in all types of soil with all lead and lifts including all labour and T & P etc. required for proper completion of works as per direction of Engineer-in-charge.
TEMPORARY RIVER TRAINING WORKS ALONG LEFT BANK OF RIVER GANGA U/S OF SHASTRI BRIDGE , FROM CH 850.00 M TO 950.00 M IN MAGH MELA 2025-26
Earth work in cutting slope of river banks in all types of soil with all lead and lifts including all labour and T & P etc. required for proper completion of works as per direction of Engineer-in-charge.
Annual Plan KALPETTA MUNICIPALITY 2025 26 PR NO 622 26 SHOULDER CONCRETE FROM MYTHANI TO FATHIMA BRIDGE General Civil Work RE TENDER
... sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor ...
Protection work on Puwayan Nigohi Tilhar Jaitipur Dataganj badaun Road (SH-126) Bahgul River Bridge in Distt. Shahjahanpur Fin. Year 2025-26
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres