Loading…
Loading…
20,230 results • Best match
ZPBEED/WD2/DPDC/163/2025-26
eProcurement System Government of Maharashtra Created By: Vijay Dattatray Sapkale Created Date/Time: 25-Apr-2026 02:03 PM Tender Title: CONSTRUCTION OF VENT BRIDGE ON MALNATHPUR PARCHUNDI TADOLI TO SH235 ROAD IN KM 1/200 VR-45 TQ. PARALI V Tender ID: 2026_BEED_1270052_1
Construction of Bridge on maharastra Boarder Murki-handarki SH-122 at Km 32.10 Yangunda Village in Aurad Taluka, Bidar District.
This is to certify that M/s. ………………………….. is a reputed company with a good financial standing. If the contract for this work, namely ……………………………… (Name of the work) is awarded to the above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. …………… to meet the working capital requirements for executing the above contract
West Karbi Anglong/07 Construction of Bridge in West Karbi Anglong District,Br.No.3/1 on Langhemi to Umpho road
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m Br. No. 3/1 Langhempi to Umpho road (Span 1 x 25)
Construction Of Box Cell Bridge At Ch.0/180 On Road VR-20 To Mashti Road ,Block-Dharmabad Dist-Nanded.
Construction of single span Bridge at R.D. 4980 m. on main canal of Sapan Medium Project Tq. Achalpur Dist. Amravati
Construction of single span Bridge at R.D. 4980 m. on main canal of Sapan Medium Project Tq. Achalpur Dist. Amravati
Construction of 3x10m Span Minor Bridge in Km-15 of Ajeetpur Punjab Nagar Jaulpur Patwai Road (ODR) in Dist. Rampur .
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres