Loading…
Loading…
20,168 results • Best match
ESTIMATE FOR CONSTRUCTION OF BRIDGE AT RD 24000(FT) OF UDEKARAN DISTY AND PROVIDING CULVERT ACROSS VARIOUS POINTS OF UDEKARAN DISTY
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil
Construction of Bridge Across River of Shuntikumbri Village in Samse GP of Kalasa Taluk in Chikkamagaluru District (RESERVED FOR CAT-2A)
CONSTRUCTION OF A BRIDGE ON KUSUGAL-SHIROLA STATE HIGHWAY-264 IN 39 KM IN NARAGUND TALUK OF GADAG DIST (NEAR HUNASIKATTI)
... awarded with ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬________________________ [brief details of works], we may extend credit facilities upto Rs. __________ Lakhs, to meet his/ their working capital requirement towards the execution of the said work order as per the Loan Policy ...
CONSTRUCTION OF MINOR BRIDGE WITH APPROCHES AT KM.16/850 ON SAWALI JALALKHEDA PARSODI WAKODI WAKI ROAD MDR-96 IN SAONER TALUKA OF DISTRICT NAGPUR (2ND.CALL)
CONSTRUCTION OF MINOR BRIDGE WITH APPROCHES AT KM.16/850 ON SAWALI JALALKHEDA PARSODI WAKODI WAKI ROAD MDR-96 IN SAONER TALUKA OF DISTRICT NAGPUR (2nd.Call)
Construction of road from Nandichak Pucca Bridge To Dumardari Ongc More Via Udbadal Bridge, Jl. No.-268-260, Plot No.-91- 1192 under Basudevberia GP within Bhagawanpur-II Block (Length 7.000 km) in the District of Purba Medinipur
eProcurement System of Government of West Bengal Created By: Debraj Bose Created Date/Time: 29-Dec-2025 01:53 PM Tender Title: Construction of road from Nandichak Pucca Bridge To Dumardari Ongc More Via Udbadal Bridge, Jl. No.-268-260, Plot No.-91- 1192 under Basudevberia GP within Bhagawanpur-II Block (Length 7.000 km) in the District of Purba Medinipur Tender ID: 2025_PRD_939901_51
Construction of H.L Bridge with Weir over LOCAL nallah at 0.700 K.M. on Dhodrapara to Dhodrapara Colony road in the District of Nabarangpur under SBY for the year 2024-25
Earthwork in excavation for bridge works in all kinds of soil, by mechanical means utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete... specifications as per Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction ...