Loading…
Loading…
20,292 results • Best match
TEMPORARY River Training work from chainage 750.00 M to 8.500 M D/S of Shastri Bridge R/Bank of River Ganga in Magh Mela 2025-26
Earth work in cutting slope of river banks in all types of soil with all lead and lifts including all labour and T & P etc. required for proper completion of works as per direction of Engineer-in-charge.
TEMPORARY River Training work from chainage 610.00 M to 710.00 M D/S of Shastri Bridge L/Bank of River Ganga in Magh Mela 2025-26
Earth work in cutting slope of river banks in all types of soil with all lead and lifts including all labour and T & P etc. required for proper completion of works as per direction of Engineer-in-charge.
TEMPORARY River Training work from chainage 1325.00 M to 1425.00 M D/S of Shastri Bridge L/Bank of River Ganga in Magh Mela 2025-26
Earth work in cutting slope of river banks in all types of soil with all lead and lifts including all labour and T & P etc. required for proper completion of works as per direction of Engineer-in-charge.
TEMPORARY River Training work from chainage 970.00 M to 1070.00 M D/S of Shastri Bridge L/Bank of River Ganga in Magh Mela 2025-26
Earth work in cutting slope of river banks in all types of soil with all lead and lifts including all labour and T & P etc. required for proper completion of works as per direction of Engineer-in-charge.
GENERAL-Emergency Monsoon Preparedness 2025-Removal of silt and debris near Muthuvattassery bridge in Iyadu-Nellamkandythodu of Kizhakoth Panchayat/Koduvally LA, Kozhikode District -General Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
R/R damages on BBRC road Km 7/00 to 28/00 (SH- Protection work of Bagthan Bridge abutment at RD 22/0) under PDNA 2023
Earth work in excavations for structure as per drawing and technical specifications clause 305.1 (Clause ThreeHundred Five point One) including setting out, construction of shoring and bracing removal of stumps and other deleterious material and disposal ...