Loading…
Loading…
20,292 results • Best match
Construction of Retaining wall for Bridge at km 3.60 and Construction of CD at km 4.30 in Kolagibis Herur road in Sirsi Taluk Uttara KAnnada District.(FOR CAT IIA CONTRACTORS ONLY)
Refer tender document
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
Construction of footpath bridge near Ratan Gurung house, Kalisher
Construction Of Foot Bridge Near Kaya Khampa Yokma House
CONSTRUCTION OF PAHARUA TO BRIDGE ROAD LENGTH 1.70 K.M.
Construction of Sakav at Bambuli Bridge Poyvaril Tal Kudal