Loading…
Loading…
20,542 results • Best match
Construction Of CC Road With Culvert From Nakkati Bridge To Katha Diara High School (1.5- 2 Kms) at Mahanandatola GP under Ratua-I Block (Length of the Road 1.390 Km)
Name of the work under Administrative Block : Construction Of CC Road With Culvert From Nakkati Bridge To Katha Diara High School (1.5- 2 Kms) at Mahanandatola GP under Ratua-I Block (Length of the Road 1.390 Km)
Improvements to (U/s portion) Sringeri pickup and Construction of approach road to bridge across dharma river near Sringeri pick up under Dharma project in Hangal taluk of Haveri district.
Construction of RCC Box Cell Bridge on Srirampur BT Road to KS road at Ballomjhora along with Boulder Protection in both side approaches for the year 2025-26. (Package No. TN_130_01)
CD Works Size: 8 Cell x 5.00m x 5.00m 11.1 Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. V Marshy soil
Construction of Protection wall in km no. 1.50 and 2.00 of Sankeshwar Sadalaga SH-97 In Hukkeri taluka of belagavi district under 3054 SH Bridge Maintenace for the year 2025-26.
construction of protection wall in km no1.5 and 2.00 of sankeshwar sadlga SH-97 IN Hukkeri taluka off belgaum district under 3054 sh bridge maintenace for the year 2025-26
CONSTRUCTION OF BRIDGE AT KM 165.20 ON PATTAN CROSS - NARAYANPUR SH-155 ROAD IN SHORAPUR CONSTITUENCY, HUNASAGI TALUK, YADGIR DISTRICT. (UNDER 5054-80-190-0-01-132 FOR THE YEAR 2025-26)
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
The estimate is prepared for the demolition and reconstruction of foot bridge at Ch 4200 m of Mazhuvannoor Branch canal. The items proposed in this estimate are demolition of existing slab and pillar, earth work excavation
foot bridge