Loading…
Loading…
20,544 results • Best match
The estimate is prepared for the demolition and reconstruction of foot bridge at Ch 4200 m of Mazhuvannoor Branch canal. The items proposed in this estimate are demolition of existing slab and pillar, earth work excavation
foot bridge
Side protection Works
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) ...
GENERAL Side protection Raising of existing retaing wall in the right bank of valiya thodu near new By pass road bridge in ward no10 of Kaduthuruthy panchayath in Kaduthuruthy Constituency General Civil Work 1
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Maintenance of CD at CH.8.15 Km on Jidga Cross to Madanhipparga Road (MDR) in Aland Taluka Dist. Kalaburagi under 3054 MDR Bridge Maintenance for the Year 2025-26 (Work Reserved for Category-IIA)
Maintenance of CD at CH.8.15 Km on Jidga Cross to Madanhipparga Road (MDR) in Aland Taluka Dist. Kalaburagi under 3054 MDR Bridge Maintenance for the Year 2025-26
Maintenance of CD at CH.10.50 Km on Jidga Cross to Madanhipparga Road (MDR) in Aland Taluka Dist. Kalaburagi under 3054 MDR Bridge Maintenance for the Year 2025-26 (work Reserved for SC category)
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm a...
S/R to Repair to H.L Bridge over River Prachi on Krushna prasada to Jahangiripur Road for the year 2025-26