Loading…
Loading…
20,636 results • Best match
Prov. illumination for construction of bridge on 18M road of main drain No. 2 and in internal park in sector-40 and Pdg. illumination at sector entry point and main park entry point in sector-18, Panipat
[23.22.1.3]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.3. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. TRIPLE POLE MCCB 16 to 100 Amp, 25 KA [Through Rate]
Widening from Two Lane to Four Lane and Strengthening at Km 20/0-24/0 of Polur Chengam road including Construction of Centre Median, Reconstruction and widening of Culverts and Widening of Minor Bridge - TVM-178
... soil and bigger size towards the wall including cost and conveyance of all materials to worksite and including labour charges and all other incidental charges etc.,completeRunning... gravel including cost of gravel having pi value less than 6, conveyance of gravel to worksite. Laying, handling charges and filling in layers tamping under optimum moiture content ...
Construction of 3x7x5 meter span Box Culvert, Approach Road and Additional Approach in place of narrow and damaged minor bridge on Gangi River at Km-3 of contact road from Itahara via Satmesara to Baburam house
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal ...
CONSTRUCTION OF BRIDGE AT CH 46.3 KM AND SLAB CULVERT AT CH 34.3 KM AND ROAD RETAINING WALL ON KUMTA KALKOPPA ROAD SH142 IN SIDDAPUR TALUK OF UTTARA KANNADA DISTRICT (RESERVED FOR SC CATEGORY CONTRACTORS ONLY)
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/ excluding Monsoon cost of balance works remaining Rs. in lac Probable date of completion
CONSTRUCTION OF MINOR BRIDGE (CD) ON PATTAN CROSS TO NARAYANPUR SH - 155 ROAD AT KM.123.00, 123.90 AND 125.40 IN SHORAPUR CONSTITUENCY HUNASAGI TALUKA, YADGIR DISTRICT. (UNDER 5054-80-190-0-01-132 FOR THE YEAR 2025-26)
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing Guard wall of masonary work both side of fallen bridge at Chinakuri SGP under CKI-SDPR group under Sodepur Area.