Loading…
Loading…
8,366 results • Best match
Reconstruction/repair of civil structures and laying of damaged rising main and distribution at various locations under SASSCI Work wise details given Annexure I
Steel work welded in built up sections/framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.( gate size 3.50 x 1.75 )
DEPOSIT-KIIFB-Pipeline shifting at Kankakkadavu Kuttipuram Panchayath for the Construction of Regulator Cum Bridge across Bharatappuzha-General Civil Work
Working charges
Construction of Administrative Block including site development for BTC Home Guards at Markand Distt Bilaspur HP Civil AND Electrical Work
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Repair and Renovation of VPRC Building at Donimedu Panchayat
Repair and Renovation of VPRC Building at Donimedu Panchayat
NABARD-RIDF - Infrastructural Development Works - Maneed Puncha Part II-Maneed puncha Part II Recasted Estimate-General Civil Work
OD6138/2025-2026:Modified 5.33.1.1. Providing and laying in position ready mixed or site mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement All work upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum
Facility Management Services - LumpSum Based - Construction of CC Road at Electricity Store Centre Gonda; Civil Works; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Construction of CC Road at Electricity Store Centre Gonda; Civil Works; Consumables to be provided by service provider (inclusive in contract cost)