Loading…
Loading…
8,366 results • Best match
Construction of leftover portion of Second floor of Journalism and Media Studies building at New Campus Civil wok
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level
REPAIRS AND RENOVATION OF 02 WARD IN MAIN HOSPITAL BUILDING AT KMCRI CAMPUS, HUBBALLI
Repairs and Renovation of 02 Ward in Main Hospital Building at KMCRI Campus, Hubballi
KSWMP Project No 94 23 24 Construction of Weigh Bridge at ward 27 of Trenching Ground Construction of Weigh Bridge General Civil Work
CONSTRUCTION OF CONTROL ROOM FOR WEIGH BRIDGE
Comprehensive Annual Repair Maintenance and Operation ARMO Civil Electrical Horticulture works for ESIC Medical College and Hospital, JAIPUR for one year The contract shall be extendable further one more year subjective performance of the cont
Rate Invite Tender for carry out consultancy work in the operation of civil works for all ranges under the jurisdiction of Ekta nagar
Rate Invite Tender for carry out consultancy work in the operation of civil works for all ranges under the
Reconstruction of the damage boundary wall of the premises, construction of a Guard room with toilet and other civil works at Hightech Lab Meerut
Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. NSI Ref CSI No. 9.01 (SOR 23-24)