Loading…
Loading…
Tender Value
₹3.7 L
EMD Value
₹9,343
Closing Date
8 Jun 2026, 3:00 pm2d left
AEE
AEE PALAKKAD MUNICIPALITY
KSWMP Project No 94 23 24 Construction of Weigh Bridge at ward 27 of Trenching Ground Construction of Weigh Bridge General Civil Work
2026_LSGD_842086_2
KSWMP/PKD/1484/471/26
Open Tender
Civil Works - Buildings
90 days
Palakkad
PLEASE REFER TENDER DOCUMENTS
13 documents required · 13 mandatory
₹747
₹9,343
PALAKKAD MUNICIPALITY
18 May 2026
18 May 2026
8 Jun 2026
18 May 2026
8 Jun 2026
18 May 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1CONSTRUCTION OF CONTROL ROOM FOR WEIGH BRIDGE | ||||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | - | metre | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | - | sqm | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | - | cum | - | - | BI01010001010000000000000515BI0100001120 |
| 1.008 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - | BI01010001010000000000000515BI0100001121 |
| 1.009 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.67 MB
RFQWB471.pdf
Tender Documents • 1.76 MB
BOQ_1439057.xls
BOQ • 0.32 MB
NITWB471.pdf
Tender Documents • 0.66 MB
Download all tender documents and submit your bid