Loading…
Loading…
8,374 results • Best match
Repair and Renovation of PUE School Building at Mambakkam Panchayat
Repair and Renovation of PUE School Building at Mambakkam Panchayat
Construction of 01 no 33 KV Industrial Corridor Bay and Related Civil works at 132 KV S/S Kabrai, Distt. Mahoba. (PR. 1300080410/2026)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (Code No. 10.25.2)
Profile correction and turfing works to Downstream side of Earth Dam and rectification works to existing parapet wall at Saddle Dam Pallamvetty General Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Repairs and Renovation of SHG RCC Roof Building at Pattanam Panchayat in Thimiri Panchayat Union
Repairs and Renovation of SHG RCC Roof Building at Pattanam Panchayat in Thimiri Panchayat Union
CONSTRUCTION OF 100 BEDDED CIVIL HOSPITAL AT NAWAGARH, DISTRICT- BEMETARA (C.G.) I/C INTERNAL WATER SUPPLY SANITARY FITTING, ELECTRIFICATION WORK ETC.
Deposit Vikasbhavan Section Construction of new septic tank at Poochedivila Post Metric Girls Hostel Law College Junction PMG Thiruvananthapuram Civil work
OD346327/2025-2026:(Ref. 5.33.1.1 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum